Refereed
Journals - Published or Accepted for Publication
Hepdogan, S., R. Moraga, G.W. DePuy, and G.E.
Whitehouse, 2009. “A Meta-RaPS Solution for the Early/Tardy
Single Machine Scheduling Problem,” International Journal
of Production Research, Vol. 47, No. 7, pp. 1717-1732.
Hepdogan, S., R. Moraga, G.W.
DePuy, and G.E. Whitehouse, 2008. “Nonparametric Comparison
of Two Dynamic Parameter Setting Methods in a Meta-Heuristic
Approach,” Journal of Systemics,
Cybernetics, and Informatics, Vol. 5, No. 5, pp. 46-52.
DePuy G.W., J.S. Usher, R.L. Walker, and G.D. Taylor, 2007.
“Production Planning for Remanufactured Products,”
Production Planning and Control, Vol. 18, No. 7, pp. 573-583.
* Note: The above paper received the Production Planning
and Control Best Paper Award for 2007.
DePuy, G.W., and G.D. Taylor, 2007. “Using
Board Puzzles to Teach Operations Research,” INFORMS
Transactions on Education, Vol. 7, No. 2.
Lan, G., G.W. DePuy, and G.E. Whitehouse, 2007. “An
Effective and Simple Heuristic for the Set Covering Problem,”
European Journal of Operational Research, Vol. 176, No. 3,
pp. 1387-1403.
Lan, G., and G.W. DePuy, 2006. “On the
effectiveness of incorporating randomness and memory into
a multi-start metaheuristic with application to the Set Covering
Problem,” Computers & Industrial Engineering, Vol.
51, pp. 362-374.
Taylor, G.D., T. Whyte, G.W. DePuy,
D. Drosos, 2005. “A Simulation-Based Software System
for Barge Dispatching and Boat Assignment in Inland Waterways,”
Simulation Modelling Practice and Theory, Vol. 13, No. 7,
pp. 550-565.
DePuy G.W., G.E. Whitehouse, and R.J. Moraga,
2005. “Un Enfoque Meta-heurístico para el Problema
de Programación de Proyectos con Recursos Limitados,”
(A meta-heuristic approach for the resource constrained project
scheduling problem), Revista del Instituto Chileno de Investigación
Operativa (Journal of the Chilean Operations Research Institute),
Vol. 7, No. 2.
DePuy, G.W., R.J. Moraga, and G.E. Whitehouse,
2005. “Meta-RaPS: A Simple And Effective Approach For
Solving The Traveling Salesman Problem,” Transportation
Research Part E: Logistics and Transportation Review, Vol.
41, No. 2, pp. 115-130.
Moraga, R.J., G.W. DePuy, and G.E. Whitehouse,
2005. “Meta-Raps Approach for the 0-1 Multidimensional
Knapsack Problem,” Computers & Industrial Engineering,
Vol. 48, No. 1, pp. 83-96.
Ralston, P., G.W. DePuy, and J. Graham, 2004.
“Graphical Enhancement to Support PCA-Based Process
Monitoring and Fault Diagnosis,” ISA Transaction, Vol.
43, No. 4, pp. 639-653.
DePuy, G.W., G.D. Taylor and T. Whyte, 2004.
“Barge Fleet Layout Optimization,” International
Journal of Computer Integrated Manufacturing, Vol. 17, No.
2, pp. 97-107.
Moraga R.J., G.E. Whitehouse, and G.W. DePuy,
2004. “Meta-RaPS: Un Enfoque de Solución Eficaz
para Problemas Combinatorios” (Meta-RaPS: an effective
solution approach for combinatorial problems), Revista de
Ingeniería Industrial, Vol. 2, No. 1, pp. 5-18.
Whitehouse, G.E., and G.W. DePuy, 2001. “Solving
Constrained Multiple Resource Networks Both Forward and Backward
Using Brooks Algorithm,” Project Management Journal,
Vol. 32, No. 4, pp. 24-31.
DePuy, G.W. and G.E. Whitehouse, 2001. “A
Simple and Effective Heuristic for the Resource Constrained
Project Scheduling Problem,” International Journal of
Production Research, Vol. 39, No. 14, pp. 3275-3287.
DePuy, G.W., M.W.P. Savelsbergh, J.C. Ammons,
and L.F. McGinnis, 2001. “An Integer Programming Heuristic
for Component Allocation in Printed Circuit Card Assembly
Systems,” Journal of Heuristics, Vol. 7, pp. 351-369.
DePuy, G.W., and J.S. Usher, 2001. “The
Effect of Quality Losses on Binomial Yield Processes,”
Quality Engineering, Vol. 13, No. 4, pp. 595-600.
DePuy, G.W. and J.S. Usher, 2001. “A
Heuristic Approach to the Batch Sizing Problem,” Production
Planning and Control, Vol. 12, No. 4, pp. 372-378.
Ralston, P., G.W. DePuy, and J. Graham, 2001.
“Computer-Based Monitoring and Fault Diagnosis: A Chemical
Process Case Study,” ISA Transaction, Vol. 40, pp. 85-98.
DePuy, G.W. and G.E. Whitehouse, 2000. “Applying
the COMSOAL Computer Heuristic to the Constrained Resource
Allocation Problem,” Computers & Industrial Engineering,
Vol. 38, No. 3, pp. 413-422.
DePuy, G.W., J.C. Ammons, and L.F. McGinnis,
2000. “Multiple Assignment of Component Types to Feeder
Slots on Automated Printed Circuit Card Placement Machines,”
IEEE Transactions on Electronics Packaging Manufacturing,
Vol. 23, Number 3, pp. 157-164.
Ammons, J.C., M. Carlyle, L. Cranmer, G.W.
DePuy, K.P. Ellis, L.F. McGinnis, C.A. Tovey, and H. Xu, 1997.
"Component Allocation to Balance Workload in Printed
Circuit Card Assembly Systems," IIE Transactions, Vol.
29, Number 4, pp. 265-275.
Ammons, J.C., M. Carlyle, G.W. DePuy, K.P.
Ellis, L.F. McGinnis, C.A. Tovey, and H. Xu, 1993. "Computer-Aided
Process Planning in Printed Circuit Card Assembly," IEEE
CHMT Transactions, Vol. 16, No. 4, pp. 370-376.
McGinnis, L.F., J.C. Ammons, M. Carlyle, L.
Cranmer, G.W. DePuy, K.P. Ellis, C.A. Tovey, and H. Xu, 1992.
“Automated Process Planning for Printed Circuit Card
Assembly,” IIE Transactions, Vol. 24, No. 4, pp. 18-30.
Book
Chapters
Moraga, R.J., G.W. DePuy, and G.E. Whitehouse,
2006. “Metaheuristics: A Solution Methodology for Optimization
Problems,” Handbook of Industrial and Systems Engineering,
CRC Press, Taylor and Francis, Chpt. 10, pp.1-13.
Refereed
Proceedings Papers
DePuy, G.W., 2009. “Design
Tool for Unit Load AS/RS Systems,” Proceedings of the
2009 Industrial Engineering Research Conference, May 30-June
3, 2009, Miami, Florida, 6 pages.
McCardle, R.M., G.W. DePuy, and L. Chen, 2009.
“Farm Management Optimization,” Proceedings of
the 2009 Industrial Engineering Research Conference, May 30-June
3, 2009, Miami, Florida, 6 pages.
DePuy, G.W., D. Grieshaber, and C.T. Hardin,
2009. “Skills Management Assignment Problem with Dynamic
Costs,” Proceedings of the 2009 Industrial Engineering
Research Conference, May 30-June 3, 2009, Miami, Florida,
6 pages.
Jackson, E., G.W. DePuy, and G.W. Evans, 2008.
“Logistics Skills Management Heuristics,” CD-ROM
Proceedings of the 2008 Industrial Engineering Research Conference,
May 17-21, 2008, Vancouver, British Columbia, Canada, 6 pages.
Elmes, B.B., G.W. Evans, and G.W. DePuy, 2008.
“A Large Scale Multi-Objective DSS for Workforce Training,”
CD-ROM Proceedings of the 2008 Industrial Engineering Research
Conference, May 17-21, 2008, Vancouver, British Columbia,
Canada, 6 pages.
Taylor, G.D., G.W. DePuy, and J.S. Usher,
2007. “Layout Optimization for Barge Fleet Operations,”
CD-ROM Proceedings of the 2007 Industrial Engineering Research
Conference, May 19-23, 2007, Nashville, TN, 6 pages.
Evans, G.W. and G.W. DePuy, 2007. “Using
a Simulation/Optimization Tool for Determining Inventory Policies
in a Distribution System,” CD-ROM Proceedings of the
2007 Industrial Engineering Research Conference, May 19-23,
2007, Nashville, TN, 6 pages.
Hardin, C.T., J.S. Usher, G.W. DePuy, and
A.S. Elmaghraby, 2007. “Self Organizing Tiles: A New
Facilities Layout Method,” CD-ROM Proceedings of the
2007 Industrial Engineering Research Conference, May 19-23,
2007, Nashville, TN, 6 pages.
DePuy G.W., J.S. Usher, and
B. Arterburn, 2006. “Workforce training schedule for
logistics skills,” CD-ROM Proceedings of the 2006 Industrial
Engineering Research Conference, May 20-24, Orlando, Florida,
6 pages.
Hepdogan, S., R. Moraga, G.W. DePuy, and G.E.
Whitehouse, 2006. “A Metaheuristic for the Early/Tardy
Single Machine Scheduling Problem,” CD-ROM Proceedings
of the 2006 Industrial Engineering Research Conference, May
20-24, Orlando, Florida, 6 pages.
Evans, G.W., G.W. DePuy G.W., J.S. Usher,
and M. Chiodi, 2006. “Distribution System Operation
Using Simulation and Criterion Modeling,” CD-ROM Proceedings
of the 2006 Industrial Engineering Research Conference, May
20-24, Orlando, Florida, 6 pages.
Mora, R.P., G.W. DePuy, and J.S. Usher, 2006.
“Applying combinations of heuristics to the QAP,”
CD-ROM Proceedings of the 2006 Industrial Engineering Research
Conference, May 20-24, Orlando, Florida, 6 pages.
Hepdogan, S., R. Moraga, G.W. DePuy, and G.E.
Whitehouse, 2006. “Solving the 0-1 Multidimensional
Knapsack Problem,” CD-ROM Proceedings of the 2006 Industrial
Engineering Research Conference, May 20-24, Orlando, Florida,
6 pages.
Lan, G., and G.W. DePuy, 2005. “The
Study on Incorporating Tabu Search Strategies into A Multi-start
Meta-heuristic,” CD-ROM Proceedings of the 2005 Industrial
Engineering Research Conference, May 14-18, 2005, Atlanta,
Georgia, 6 pages.
Song, J., G.W. DePuy, and G.W. Evans, 2005.
“A heuristic for the vehicle routing problem with time
windows,” CD-ROM Proceedings of the 2005 Industrial
Engineering Research Conference, May 14-18, 2005, Atlanta,
Georgia, 6 pages.
Usher, J., G.W. DePuy, and T. Nguyen, 2005.
“The Forward-Reserve Problem With Seasonal Demand,”
CD-ROM Proceedings of the 2005 Industrial Engineering Research
Conference, May 14-18, 2005, Atlanta, Georgia, 6 pages.
DePuy, G.W., J.S. Usher, and T.J. Miles, 2004.
“Facilities layout using a CRAFT meta-heuristic,”
CD-ROM Proceedings of the 2004 Industrial Engineering Research
Conference, May 15-19, 2004, Houston, Texas, 6 pages.
Moraga, R.J., G.W. DePuy, and G.E. Whitehouse,
2004. “A Meta-Heuristic and Oscillation Improvement
Strategy for the 0-1Multidimensional Knapsack Problem,”
CD-ROM Proceedings of the 2004 Industrial Engineering Research
Conference, May 15-19, 2004, Houston, Texas, 6 pages.
Song, J., G.W. DePuy, and G.W. Evans “Metaheuristic
Approaches for the Dial-A-Ride Problem,” CD-ROM Proceedings
of the 2004 Industrial Engineering Research Conference, May
15-19, 2004, Houston, Texas, 6 pages.
Usher, J.S. and G.W. DePuy, 2003. “Robust
layout design using quadratic loss,” CD-ROM Proceedings
of the 2003 Industrial Engineering Research Conference, May
18-21, Portland, Oregon, 6 pages.
Whitehouse, G.E., G.W. DePuy, and R.J. Moraga,
2002. “Meta-RaPS Approach for Solving the Resource Allocation
Problem” CD-ROM Proceedings of the 2002 World Automation
Congress, June 9-13, Orlando, Florida, 6 pages.
DePuy, G.W., G.E. Whitehouse, and R.J. Moraga,
2002. “Using The Meta-Raps Approach to Solve Combinatorial
Problems,” CD-ROM Proceedings of the 2002 Industrial
Engineering Research Conference, May 19-21, Orlando, Florida,
6 pages.
DePuy, G.W., D. Drosos, G.D. Taylor, and T.
Whyte, 2002. “Grouping and Assignment of Barges,”
CD-ROM Proceedings of the 2002 Industrial Engineering Research
Conference, May 19-21, Orlando, Florida, 6 pages.
Drosos, D., G.W. DePuy, G.D. Taylor, and T.
Whyte, 2002. “Clustering Techniques in Barge Transportation,”
CD-ROM Proceedings of the 2002 Industrial Engineering Research
Conference, May 19-21, Orlando, Florida, 6 pages.
DePuy, G.W., J.S. Usher, and J.E. Raisor,
2001. “Automated Production Planning for Repairable
Units,” CD-ROM Proceedings of the 2001 Industrial Engineering
Research Conference, May 20-22, Dallas, Texas, 6 pages.
Drosos, D., G.W. DePuy, and G.D. Taylor, 2001.
“Scheduling and Grouping of Barges,” CD-ROM Proceedings
of the 2001 Industrial Engineering Research Conference, May
20-22, Dallas, Texas, 6 pages.
Taylor, G.D., G.W. DePuy, and T. Whyte, 2001.
“Layout Optimization to Support Barge Fleet Operations,”
Proceedings of the International Conference on Industrial
Engineering and Production Management, August 20-23, Quebec
City, Canada, pp. 189-198.
DePuy, G.W. and J.S. Usher, 2000. “A
Batch Sizing Heuristic for Processes with Quality Losses,”
CD-ROM Proceedings of the 2000 Industrial Engineering Research
Conference, May 21-23, Cleveland, Ohio, 6 pages.
DePuy, G.W., J.C. Ammons, and L.F. McGinnis,
1997. “Formulation of a General Component Allocation
Model for Printed Circuit Card Assembly Systems,” Proceedings
of Sixth Industrial Engineering Research Conference, May 17-18,
Miami, Florida, pp. 444-449.
Proceedings
Papers
Hepdogan,
S., R. Moraga, G.W. DePuy, and G.E. Whitehouse, 2006. “Nonparametric
Comparison of Two Dynamic Parameter Setting Methods in a Meta-Heuristic
Approach,” Proceedings of the 2nd International Symposium
on Management, Engineering and Informatics: MEI'06, July 16-19,
Orlando, Florida, 6 pages.
* Note: the
above paper was selected as the best paper in the Innovations
in Heuristics and Local Search: Improvements through Systematic
Analysis session.
Mora, R., G.W. DePuy, J.S.
Usher, 2005. “Applying multiple priority rules to the
QAP with application to the airline industry,” CD-ROM
Proceedings of INFORMS Annual Meeting 2005,” November
13-16, New Orleans, 6 pages.
Lan, G., G.W. DePuy, and G.E.
Whitehouse, 2004. “An effective and simple heuristics
based on Meta-RaPS to solve the set covering problems,”
CD-ROM Proceedings of the34th International Conference on
Computers & Industrial Engineering, November 14-16, San
Francisco, California, 6 pages.
Lan, G., G.W. DePuy, and G.E.
Whitehouse, 2004. “Experimental Study on Meta-RaPS SCP
with Different Priority Rules,” CD-ROM Proceedings of
the34th International Conference on Computers & Industrial
Engineering, November 14-16, San Francisco, California, 6
pages.
Hepdogan, S., G.E. Whitehouse,
and G.W. DePuy, 2004. “Use of multiple RCPSP priority
rules within a meta-heuristic,” CD-ROM Proceedings of
the34th International Conference on Computers & Industrial
Engineering, November 14-16, San Francisco, California, 6
pages.
Mora Pinzon, R.D., G.W. DePuy,
and J.S. Usher, 2004. “Applying Multiple Heuristics
To The QAP,” CD-ROM Proceedings of the34th International
Conference on Computers & Industrial Engineering, November
14-16, San Francisco, California, 6 pages.
Bush, A., W.E. Biles, and
G.W. DePuy, 2003. “Iterative Optimization and Simulation
of Barge Traffic on an Inland Waterway,” CD-ROM Proceedings
of the 2003 Winter Simulation Conference, December 7-10, New
Orleans, Louisiana, pp. 1751-1756.
Walker, R.L., G.W. DePuy,
M. Fredrick, B. Harkness, G.D. Taylor, J.S. Usher, 2003. "Automated
Production Planning for Repairable Units," American Society
of Naval Engineers/Naval Surface Warfare Center Crane Symposium:
Harnessing the Power of Technology for the Warfighter (presentation
slides published), October 16-18, 2003, Bloomington, Indiana,
11 slides.
Whitehouse, G.E., G.W. DePuy,
and R.J. Moraga, 2003. “Aplicación de Meta-RaPS
al Problema de Programación de Proyectos con Recursos
Restringidos,” Proceedings of V Congreso Chileno de
Investigación Operativ: OPTIMA 2003, September 24-26,
Viña del Mar, Chile, 4 pages.
DePuy, G.W., J.S. Usher, G.D.
Taylor, R.L. Walker, and B.F. Harkness, 2003. "Automated
Production Planning for Repairable Units," 2003 National
Center for Manufacturing Sciences (NCMS)/Commercial Technologies
for Maintenance Activities (CTMA) Symposium (presentation
slides published), March 31-April 3, Salt Lake City, Utah.
Moraga, R.J., G.W. DePuy,
and G.E. Whitehouse, 2003. “Meta-Raps Approach for Solving
the 0-1 Multidimensional Knapsack Problem,” Proceedings
of the 31st International Conference on Computers & Industrial
Engineering, February 2-4, San Francisco, California, pp.
173-178.
Ralston, P., J. Graham, G.
DePuy, C. Arnold, and S. Uhl, 2002. “Intelligent Chemometrics-Based
Approach for Chemical Process Fault Monitoring and Diagnosis,”
Proceedings of the ISCA 11th International Conference on Intelligent
Systems: Emerging Technologies, July 18 – 20, Boston,
Massachusetts, pp. 91-96.
DePuy, G.W., G.E. Whitehouse,
and R.J. Moraga, 2001. “Meta-RaPS: A Simple And Efficient
Approach For Solving Combinatorial Problems,” 29th International
Conference on Computers and Industrial Engineering, November
1-3, Montreal, Canada, pp. 644-649.
Moraga, R.J., G.E. Whitehouse,
G.W. DePuy, B. Neyveli, and S. Kuttuva, 2001. “Solving
the Vehicle Routing Problem Using the Meta-RaPS Approach,”
29th International Conference on Computers and Industrial
Engineering, November 1-3, Montreal, Canada, pp. 76-81.
Moraga, R.J., G.E. Whitehouse,
G.W. DePuy, B. Neyveli, and S. Kuttuva, 2001. “Meta-Raps:
An Efficient And Practical Approach For Solving The Traveling
Salesman Problem,” The 5th International Conference
on Engineering Design and Automation, August 5-8, Las Vegas,
NV, pp. 191-195.
DePuy, G.W., G.E. Whitehouse
and D.K. Tabler, 2000. “Using Priority Rules within
the COMSOAL Heuristic to Solve the Resource Allocation Problem,”
Proceedings of the 4th International Conference on Engineering
Design and Automation, July 30 – August 2, Orlando,
Florida, pp. 87-93.
DePuy, G.W., G.E. Whitehouse,
N.T. Schulman, A.M. AlMazid, and R. Moraga, 2000. “Modification
of the COMSOAL Approach to Solve Various Combinatorial Problems,”
Proceedings of the 4th International Conference on Engineering
Design and Automation, July 30 – August 2, Orlando,
Florida, pp. 349-354.
DePuy, G.W. and J.S. Usher,
1999. “Determining Starting Batch Sizes for Random Yield
Processes,” CD-ROM Proceedings of the 4th International
Conference on Industrial Engineering Theory, Applications
and Practice, November 17-20, San Antonio, Texas, 6 pages.
Ward, T.L. and G.W. DePuy,
1998, “Jury Evaluation of Design Safety,” Proceedings
of the 1998 IEEE International Conference on Systems, Man,
and Cybernetics, October 11-14, San Diego, California, pp.
2063-2067.
DePuy, G.W., 1998. “A
Model of Interrelated Process Planning Decisions in Electronic
Assembly Systems,” CD-ROM Proceeding of the 2nd International
Conference on Engineering Design and Automation, August 9-12,
Maui, Hawaii, 5 pages.
Ammons, J.C., G.W. DePuy,
K.P. Ellis, L.F. McGinnis, and C.A. Tovey, 1996. “Strategies
and Optimization for Circuit Card Assembly,” Proceedings
of the 1996 NSF Grantees Conference on Design and Manufacturing
Systems Research, January 2-5, Albuquerque, New Mexico, pp.
481-482.
Ammons, J.C., G.W. DePuy,
K.P. Ellis, M. Fisher, L.F. McGinnis, and C.A. Tovey, 1995.
“Process Optimization for Circuit Card Assembly,”
Proceedings of the 1995 NSF Grantees Conference on Design
and Manufacturing Systems Research, January 4-6, La Jolla,
California, pp. 229-230.
Ammons, J.C., G.W. DePuy,
K.P. Ellis, M. Fisher, L.F. McGinnis, and C.A. Tovey, 1994.
“Process Optimization for Circuit Card Assembly,”
Proceedings of the 1994 NSF Grantees Conference on Design
and Manufacturing Systems Research, January 5-7, Cambridge,
Massachusetts, pp. 303-304.
Ammons, J.C., R. Baskerville,
M. Carlyle, G.W. DePuy, K.P. Ellis, M. Fisher, L.F. McGinnis,
C.A. Tovey, and H. Xu, 1993. “Process Optimization for
Circuit Card Assembly,” Proceedings of the 1993 NSF
Grantees Conference on Design and Manufacturing Systems Research,
January 6-8, Charlotte, North Carolina, pp. 949-953.
Ammons, J.C., M. Carlyle,
G.W. DePuy, K.P. Ellis, L.F. McGinnis, C.A. Tovey, and H.
Xu, 1992. “Productivity Improvements in SMD Placement
Through CAPP,” Proceedings of International Society
of Hybrid Microelectronics Conference, October 19-21, San
Francisco, California, pp. 18-22.
Ammons, J.C., M. Carlyle,
G.W. DePuy, K.P. Ellis, L.F. McGinnis, C.A. Tovey, and H.
Xu, 1992. “Computer Aided Process Planning in Printed
Circuit Card Assembly,” Proceedings of the 13th International
Electronics Manufacturing Technology Symposium, September
28-30, Baltimore, Maryland, pp. 370-376.
|